Dry Locations:
1) Pull off lid
with pliers at arrows, attach to wall by bolting or screwing through the
two mounting tabs.
2)
Attach 1/2" trade size conduit and fittings or Neon Power Pro Neon
Sign Cables to box through provided holes and tighten locknuts against bonding
plate.
3)
Strip back wire to expose 1" of copper, twist wires together, loop
around post between cupped washer and nut, tighten nut.
4)
Snap on cover.
Wet Locations:
1) Mount box
on wall at least 12" from the floor with fittings facing down.
2)
If Neon Sign Cables are used, do not strip within 4" of ground shield
or within 2" in dry location.
3)
Use liquid-tight conduit fittings for conduit, and sealing rings if using
Neon Sign Cable.
SEE INSTALLATION INSTRUCTIONS FOR COMPLETE DETAILS